Blog

Network Rack/Cabling Replacement

Купить СНПЧ А7 Великий Новгород, оперативная доставка

2007

Task: Equipment, cabling and servers all needing to be updated and or replaced at 12 separate locations.

Background: Many locations did not have proper racks, routers and switches are out of support and Metro-Over-Ethernet connections to be deployed.  All connections going back to main office/data center.

 

More in this category: Hyper-V to VMware Migration »


© Copyright 2002-2020  Wiredsmith.com. All Rights Reserved

PHONE:  480-407-6070 | EMAIL: This email address is being protected from spambots. You need JavaScript enabled to view it. |